Lifecycle Costing: The Real Cost of “Saving Money” in Design

  • Jan 4
  • 4 min read


CRE owners strategizing over assets using life cycle cost analysis

Most owners have heard some version of this in a design meeting:

“We can save money if we take that out.”


Sometimes that’s true. Often it isn’t.


In buildings, “saving money” usually means moving costs from capital to operations, where they show up as higher utility spend, more service calls, shorter equipment life, and earlier replacement cycles. The project looks cheaper. The asset becomes more expensive.


Lifecycle Cost Analysis (LCCA) is the tool that forces the honest question:

What will this decision cost me over the life of the building—when the easy assumptions stop being true?


1) The first-cost trap owners keep paying for


First cost is clean and immediate. It fits in a budget line and a tender form.

But buildings don’t operate in tender forms. They operate in:

·       volatile energy pricing

·       increasing tenant expectations around comfort, reliability, and disclosure

·       tightening utility capacity in many markets

·       equipment lead times and service labor constraints

·       real maintenance realities (not the “perfect world” O&M plan)


When teams value-engineer out performance, owners don’t avoid cost. They defer it, usually into a period when fixing it is harder, more disruptive, and more expensive.

LCCA exists because the cheapest option in the bid set is often the most expensive option to own.


2) What LCCA actually is (and what it isn’t)


A good LCCA is simple in concept: it compares options that deliver the same function and asks which one produces the best long-term business outcome.

It typically includes:

·       Capital cost: purchase + installation + enabling work

·       Operating cost: energy, utilities, staffing implications

·       Maintenance and replacement: frequency, cost escalation, downtime risk

·       Residual value: what’s left at the end of the study period

·       Discount rate and escalation: converting future costs into today’s dollars


What it is not: a promise. It’s a model.

So the value isn’t the spreadsheet. The value is that it makes assumptions visible—and forces a decision that matches the owner’s hold period, leasing strategy, and risk tolerance.


3) The assumptions that quietly decide the outcome


Owners should know this up front: LCCA can be “technically correct” and still directionally wrong if the assumptions are tuned to produce a preferred answer.

The common failure modes:

·       Discount rate games: A high discount rate can make future operating costs look irrelevant. That may be fine for a short hold. It can be reckless for a long hold.

·       Maintenance fantasy: If the model assumes perfect maintenance and no downtime, it will undercount real operating pain.

·       Replacement cycles that don’t match reality: Some equipment rarely hits its “textbook life” in real buildings.

·       Energy escalation treated as flat: Flat assumptions can be convenient—and misleading.

·       Carbon/penalty exposure ignored entirely: In many markets, some form of carbon cost, disclosure requirement, or tenant-driven reporting is becoming a factor. Even when it’s not a formal tax, it can show up as leasing friction or capex pressure later.


A capable LCCA doesn’t pretend to know the future. It tests ranges and shows sensitivity.


4) Why scenario planning is where LCCA earns its keep


Owners don’t lose money because they can’t do math. They lose money because they plan for a single future.

Scenario planning is the part of LCCA that converts uncertainty into decision clarity:

·       What if electricity increases faster than expected?

·       What if gas becomes less attractive to tenants—or harder to permit or insure?

·       What if utility infrastructure limits your ability to add load later?

·       What if the building needs a retrofit sooner than planned to remain competitive?


When LCCA is done well, these aren’t debates. They’re comparisons with numbers attached, including the range of outcomes.

That’s what boards and investment committees need: not optimism—exposure and options.


5) Where lifecycle thinking changes real decisions


LCCA tends to change outcomes most in a few places:

·      HVAC system architectureNot just “what equipment,” but whether the system is set up for recovery, staging, redundancy, and controllability. Owners feel this later in reliability and tenant complaints.

·      Envelope and air leakageThis is one of the few decisions you can’t easily fix later without major disruption. Cheap envelope decisions can lock in decades of operating cost and comfort issues.

·      Controls and metering strategyOwners don’t manage what they can’t see. Poor visibility turns “energy management” into guesswork and blame-shifting.

·      Electrical capacity and future readinessUnder-sizing electrical infrastructure can force expensive, disruptive upgrades later—often at the worst time (mid-lease, under occupancy).


The point isn’t “spend more.” The point is spend where it reduces unavoidable future cost and risk.


6) Financing and valuation: where owners should be careful


You’ll hear broad claims like “lenders reward green buildings.” Sometimes. But the real lever isn’t branding. It’s predictability.

Underwriters and capital partners tend to like assets that can show:

·       stable operating cost outlook

·       lower major-capex surprise risk

·       defensible capital planning tied to asset strategy


An LCCA that’s transparent, assumption-driven, and scenario-tested can support that story. A glossy, overconfident model can do the opposite.


7) The real cost of doing nothing


The most expensive plan is often the unspoken one:

·       reactive repairs

·       emergency replacements

·       rising operating spend with no visibility

·       downtime that hits tenants, reputation, and renewals

·       missed windows for efficient, planned work


Doing nothing doesn’t freeze the cost curve. It usually steepens it.


8) What capable owners do next


If you’re building new or planning a major retrofit, here’s the owner-grade approach:

1.     Require LCCA early (concept / schematic), not mid design stage

2.     Demand scenario ranges, not single-point forecasts

3.     Align the study period with your hold strategy (and be explicit about it)

4.     Force maintenance and replacement realism (include disruption costs where possible)

5.     Ask for sensitivity tables (what assumptions drive the outcome?)

6.     Translate results into decisions: what you’re buying, what risk you’re avoiding, what optionality you’re preserving


The goal is simple: stop buying “equipment.” Start buying financial performance you can defend.


Takeaway


a building owner is educated about his major investment in the project

Lifecycle Cost Analysis is not a sustainability exercise. It’s a way to prevent design meetings from accidentally trading away long-term asset value.

When owners use it properly, LCCA turns “value engineering” into what it should be: value protection.

CONSULTING
ENGINEERS

As advocates for sustainable practices, we uphold science as our guiding principle, fostering innovation that propels businesses towards a greener future.